Churchill Avenue Rehabilitation Update

20 11 2013

The following is a brief status report of the Churchill Avenue Rehabilitation as of November 18th, 2013.       

Churchill Ave Cycle Lanes

Thank you again for your continued patience during the construction of this complex project.  Below is a summary of work that has been completed so far, what is in store for the remainder of this year, and some details on what is to come in 2014. I would like to take this opportunity to express my appreciation for your continued cooperation throughout the construction process.

For further information on the project please visit the project website

Progress to Date

  • All traffic control signals and related roadway modifications at Kirkwood Avenue and Clare Street are complete.

The following works on Churchill Avenue between Princeton Avenue/Clare Street and Carling Avenue have been completed or are on-going:

  • Installation of new gas mains has been completed.
  • Construction of new storm sewers, sanitary sewers, and watermain, including works on connecting side streets has been completed.
  • Road excavation and placement of Granular ‘B’ sub-base for the new road has been completed.
  • Rock drilling and placement of new Hydro poles has been completed.
  • Construction of new concrete curbs is on-going.
  • Miscellaneous traffic control signals, street lighting, and other utility works have been on-going throughout.
  • Hydro Ottawa overhead line construction and transfers in order to allow for the removal of the old poles will continue throughout the fall of 2013, and into the winter of 2013/14.
  • Line painting on the new roadway.
  • Sewer and watermain construction on Churchill Avenue between Princeton Avenue/Clare Street and Byron Avenue will commence in the spring of 2014, following gas main construction, and will continue into the summer months, with road works (curbs, sidewalks, cycle tracks, paving, etc.) and utility pole relocations taking place through the latter portion of the summer and into the fall.

Works for the Remainder of 2013

  • Concrete curb construction will be completed on Churchill Avenue between Princeton Avenue/Clare Street and Carling Avenue, including connecting side streets.
  • Following concrete curb construction, the placement of Granular ‘A’ road base, including vibratory compaction and fine grading of the new roadway will be completed in advance of paving.
  • Paving of base and intermediate courses of roadway asphalt will be completed on Churchill Avenue between Princeton Avenue/Clare Street and Carling Avenue.
  • Construction of temporary asphalt sidewalks behind the newly constructed curbs will be completed for the winter months, along with temporary driveway reinstatements to all residences.  Asphalt ramps will be provided along the newly constructed curbs at each driveway location until such time that surface course asphalt is paved.

2014 Construction

  • Construction of new concrete sidewalks, raised cycle tracks, boulevards, final driveway reinstatements and detailed landscaping will commence in the spring of 2014 on Churchill Avenue between Princeton Avenue/Clare Street and Carling Avenue.
  • Gas main construction on Churchill Avenue between Princeton Avenue/Clare Street and Byron Avenue is expected to commence over the winter months, with completion by the spring of 2014.
  •  Southbound traffic will be detoured away from the construction site via Byron Avenue and Kirkwood Avenue when sewer and watermain construction on Churchill Avenue between Byron Avenue and Princeton Avenue/Clare Street commences.
  • OC Transpo Route 150 will return to its regular route over the winter months, and will then be detoured back to Kirkwood Avenue once mainline sewer and watermain construction commence on Churchill Avenue, north of Princeton Avenue/Clare Street in the spring of 2014.
  • OC Transpo Route 16 will return to its regular route once Churchill Avenue is reopened to two-way traffic, and will not be affected by the 2014 construction.

Traffic Detour / Bus Detours

  • Between Carling Avenue and Princeton Avenue/Clare Street, southbound traffic will continue on the current detour to Kirkwood Avenue from Churchill Avenue via Clare Street throughout the fall.  Churchill Avenue is anticipated to re-open to two-way traffic in early December 2013.

As per Katherine Hobbs website: http://ourkitchissippi.ca/construction/churchill-avenue-rehabilitation-update/

Advertisements

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s